At first, excavation must be done, followed by the construction of a decent rubble base, on which a concrete base with the right slopes is poured (7-15 cm). If the substrate has dried properly, installation of natural stone tiles with special glue is started.

Once the tiles are in place, the joints of the tiles must be filled with a special adhesive. After filling the joints, the tiles must be washed immediately, first with plain water and then with a special agent to help remove the last pieces of the mixture from the tiles.